Sprint 03 · Content agent · one week
A month of content in your voice, from one source document.
For owners who know consistency wins. Show up every week in your own voice, without hand-writing every post.
Sprint 03 of five · the Flow Engine · Previous: Sprint 02, Search agent · Next: Sprint 04, Outbound agent
What your team gains
About 10 hours a week, back in your diary.
You approve. The engine drafts in between.
Measured in production. Illustrative calendar.
Six deliverables. One week.
Fixed scope, built with your team, all inside the week.
- 01Voice codified
Tone, banned patterns and rules a machine can check.
- 02Engine configured
Source document in, platform-shaped drafts out.
- 03First month drafted
Passed through the voice gate.
- 04Publishing calendar
A cadence you can sustain.
- 05Source-capture habit
Feed the engine in minutes a week.
- 06Operator handbook
So your team runs the system without me.
How the week runs.
Three checkpoints in one week.
- Listen
A voice interview plus writing you love and hate.
- Run
The engine runs on your first source document, with you as the judge.
- Hand over
A month of approved content scheduled, and the handbook is yours.
Feeds the Outbound sprint: published proof gives outreach something honest to point at.
Evidence.
The engine runs in production today. Read the case study.
Questions.
What happens in the first week of the content engine sprint?
The written scope comes first: your content operation assessed in writing, gaps ranked. Then we build every deliverable here with your team inside the week, closed by a documented handover.
Do I need to hire anyone to run this afterwards?
No. Your team runs the system monthly with a human review, and the handover shows exactly how. Prefer Flow to run it? Running the Flow Engine monthly covers that.
How is this different from buying the same work from an agency?
The marketing engineer builds it with your team, on a scope and week fixed upfront. Everything is documented and portable, so it stays yours, outside any retainer.
Let’s start the content engine sprint.
Fixed scope, one week. If another system fits better, Flow will say so and we start there instead.
A short form. I reply personally.